• Stormwater for Direct Use Pilot Program

    Retrofit Project Application
  • Thank you for your interest in Metropolitan's Stormwater for Direct Use Pilot Program.

    Below are some helpful tips to keep in mind while completing the application:

    • All fields are required
    • Application will be considered complete only when all required and applicable documents are uploaded. These documents include: project construction schedule, detailed project costs, W9 form, and CEQA documents
    • Work completed on an application may be saved and continued at a later time. However, we encourage applicants to submit their completed applications as soon as possible as the application process is based on a first-come, first-served basis.

    Submission of an application neither guarantees approval into the pilot program nor secures funding.

    If you have questions while completing the application, please email StormwaterDirectUse@mwdh2o.com, or call Ms. Noosha Razavian at (213) 217-6492.

  • Project Information

  • Project Owner Contact Information

  •  -
  • Member Agency Contact Information

  •  -
  • Payment Information

  • California Environmental Quality Act (CEQA)

  • Please upload the following documents based on the respective CEQA type:

    Categorical Exemption

    1. Copy of Lead Agency Notice of Exemption (template for NOE can be found at: https://opr.ca.gov/docs/NOE.pdf)
    2. Metropolitan does not need a copy of the filing fee receipt.

    Negative Declaration

    1. Final Environmental Document plus appendices
    2. An inclusion of Metropolitan as a responsible agency in the CEQA document. 
      • If the ND is complete and Metropolitan was not listed as a responsible agency, then you must file an Addendum. (Please contact Metropolitan if you would like a suggested template.)
    3. Copy of Lead Agency's Fish and Game filing fee receipt under 711.4 (F&G Code).
    4. Notice of Determination
      • Include name, address and phone number of the contact person

    Mitigated Negative Declaration

    1. Final Environmental Document plus appendices and please include:
      • MMRP
      • Findings
    2. An inclusion of Metropolitan as a responsible agency in the CEQA document.
      • If the MND is complete and Metropolitan was not listed as a responsible agency, then you must file an Addendum. (Please contact Metropolitan if you would like a suggested template.)
    3. Copy of Lead Agency's Fish and Game filing fee receipt under 711.4 (F&G Code).
    4. Notice of Determination
      • Include name, address and phone number of the contact person

    Environmental Impact Report

    1. Final Environmental Document plus appendices and please include:
      • MMRP
      • Findings
      • Statement of Overriding Considerations
    2. An inclusion of Metropolitan as a responsible agency in the CEQA document. 
      • If the EIR is complete and Metropolitan was not listed as a responsible agency, then you must file an Addendum. (Please contact Metropolitan if you would like a suggested template.)
    3. Copy of Lead Agency's Fish and Game filing fee receipt under 711.4 (F&G Code).
    4. Notice of Determination
      • Include name, address and phone number of the contact person
         
  • Browse Files
    Cancelof
  • Additional Information

  • Browse Files
    Cancelof
  • I hearby certify that the information contained in this application is true and the supporting documents are accurate and complete.