Thank you for your interest in Metropolitan's Stormwater for Direct Use Pilot Program.
Below are some helpful tips to keep in mind while completing the application:
- All fields are required
- Application will be considered complete only when all required and applicable documents are uploaded. These documents include: project construction schedule, detailed project costs, W9 form, and CEQA documents
- Work completed on an application may be saved and continued at a later time. However, we encourage applicants to submit their completed applications as soon as possible as the application process is based on a first-come, first-served basis.
Submission of an application neither guarantees approval into the pilot program nor secures funding.
If you have questions while completing the application, please email StormwaterDirectUse@mwdh2o.com, or call Ms. Noosha Razavian at (213) 217-6492.